PROJECTS

CONSENT DECREE SANITARY SEWER IMPROVEMENTS – SHREVEPORT, LOUISIANA
  • Standard Oil Road and Wisteria Street (Area 1-131)– Constructed by Wicker Construction of Shreveport, $1,385,350
  • Union Avenue and West 72nd Street (Area 1-119) – Constructed by John Plott Construction, $1,600,000
  • Cedar Grove Trunk Main (Areas 1-105 and 1-108), joint project with Coyle Engineering Co., Inc. of Bossier City –Construction by Yor-Wic Construction. $6,000,000
  • Hollywood Ditch / West 70th Street sewer (Area 1-107) – Estimated construction cost $4,357,000

BRIDGE PROJECTS  – CADDO PARISH, LOUISIANA
  • Four-span, 28’ wide precast concrete slab span bridge (Bunbombe Rd.) completed Summer 2015
  • Five-span, 28’ wide precast concrete bridge (Buncombe Rd.) completed Summer 2016 – see video

  • Two-span, 28' wide precast concrete bridge (Blanchard-Latex Road) Completed summer 2017.
  • Four-span and 5-span bridges on Providence Road- Currently advertised

BRIDGE LOAD POSTING ANALYSES
  • Load Posting Analyses recently completed on Buncombe Road (2 bridges),
  Keithville-Springridge Road, Highland Avenue, McGoldrich Drive and Fairfield Avenue.

BRIDGE INSPECTIONS
  • Twenty-Two (22) Bridges Inspected using PONTIS procedures in Bossier and Caddo
         Parishes

PARKS AND RECREATION PROJECTS
  • Two (2) new post-tensioned tennis courts (Courts 1 & 2 and 9 & 10) at Southern Hills Park in Shreveport. 
  • New pair of doubles courts at Airport Park
  • Children's water spray park at A.B. Palmer Park

TRANSPORTATION PROJECTS
  • SporTran Bus Transfer Station at St. Vincent Avenue and W 68th St.

OTHER PROJECTS
  • Handicap accessible walkway to running track at Caddo Magnet High School
  • No-Rise Certification on Lateral B-1 in Bossier City
  • Letter of Map Revision on Benoit Bayou, Bossier City

900 Market St., Suite 201
Shreveport, LA  71101
(318) 828-1126